Acceptance Rules For High Voltage Insulators

Date: | Read: 68

1) Before the product is shipped, the buyer shall send inspection personnel to the supplier for random inspection and acceptance.
2) The supplier shall submit all product factory reports.
3) High Voltage Insulator dimensions shall be inspected according to the final confirmed drawings.
4) The quantity of products and their accessories must meet the order requirements.
5) At least 2 pieces of each of the five components shall be sampled for appearance and size inspection.
6) Check whether the length of the fasteners meets the requirements according to Section 3.2.b.
7) The supplier shall submit the material and mechanical properties test report of the fasteners.

Acceptance Rules For High Voltage Insulators

AODLEY

If you're looking to get in touch with us, our contact page is the place to be. Whether it's placing an order, requesting a quote, or getting product repairs, our team is ready to assist you.
Building 4, No. 118 Youyi North Road, Kunshan City, Suzhou City, Jiangsu Province
Business Hours:
Monday - Sunday