Operational Details Of The Epoxy Sleeve For The Handover Test

Date: | Read: 23

Prevent human defects. When the personnel responsible for the handover test remove and connect the lead wire of the small epoxy bushing of the end screen, they should pay attention to prevent the guide rod from rotating or twisting off the grounding lead wire. After the test, they should restore the original state and use a multimeter to measure whether the end screen has been reliably grounded. When taking oil samples, remember to tighten the oil sample valve. When removing and connecting the lead wire, the experimenter should pay attention to the protection of epoxy resin bushing when going up and down epoxy resin cast bushing to prevent damage to epoxy bushing manufacturer. Pay attention to the oil level of epoxy bushing for transformer, consider adding a little more oil before taking oil samples, and replenish the oil in time.

Operational Details Of The Epoxy Sleeve For The Handover Test

AODLEY

If you're looking to get in touch with us, our contact page is the place to be. Whether it's placing an order, requesting a quote, or getting product repairs, our team is ready to assist you.
Building 4, No. 118 Youyi North Road, Kunshan City, Suzhou City, Jiangsu Province
Business Hours:
Monday - Sunday